Wind, solar and electricity price loading…
Source PSE · loading…
What the markers mean
Capacity for new generators: loading…
Power plants: operating and large ones only (thresholds in “Sources and licences”)
Marker size = installed capacity, not current generation
Size examples: 100 MW – small square, 1,000 MW – medium, 5,000 MW – large.
Sources: GEM · OpenStreetMap · EMODnet · PSE
Poland at a glance loading…
Power sources on the map – choose what to show:
Marker size = installed capacity, not current generation. All markers are explained in the legend on the right.
Available connection capacity for large consumers · PSE 220/400 kV
Using capacity at one substation may reduce it at neighbouring ones – so we do not add up their capacities. Like car parks on a single access road: the more cars enter one, the harder it is to reach the other.
Extra-high-voltage grid (220/400 kV) – for the largest consumers, such as factories and data centres. Consumers connect either to the PSE grid or to the networks of distribution system operators (DSOs). SOURCE shows PGE and Energa data for now; the other operators – via the links:
- Stoen Operator (Warsaw) (opens in a new tab)
- PGE Dystrybucja (mainly east and centre) (opens in a new tab)
- Energa-Operator (mainly north) (opens in a new tab)
- Enea Operator (mainly west) (opens in a new tab)
- TAURON Dystrybucja (mainly south) (opens in a new tab)
loading…
We’ll show PSE substations and operators’ groups of substations with at least this much available connection capacity for 2031 – each one separately, without adding them up.
We search PSE substations and the distribution operators’ groups of substations – part of a name is enough.
Capacity is not added up across operators or groups.
Connections to 110 kV and lower-voltage networks are handled by distribution system operators (DSOs) – see the list of operators
Substations for new consumers
Substations built mainly for the grid and new generators – according to PSE they can also supply consumers
Next step: application templates for connection conditions to the PSE grid – PSE “Documents” page (in Polish) (opens in a new tab): Application and contract templates → Applications for connection conditions to the transmission grid
Capacity for new generators: loading…
as of: loading…
Available connection capacity for consumers · PGE Dystrybucja 110 kV
Groups of 110 kV substations – in the order of the PGE table
Available connection capacity for consumers · Energa-Operator 110 kV
Groups of 110 kV substations – in the order of the Energa table
loading…
How much of what we have is running
- Installed capacity is not available capacity: some units are under maintenance or in reserve.
- Wind and solar run when the wind blows and the sun shines – a short bar means weather or time of day, not a breakdown.
- “?” – In its report PSE gives a single capacity for wind (onshore and offshore), solar and other renewables – with no breakdown. The report also does not say whether or how this capacity includes rooftop panels. Hydro is not included here.
- No bar: hydro, oil, waste and “other” – the PSE report gives no capacity for them that can be compared with generation.
- The map shows only larger power plants, so the capacity total on the map (“Where from” tab) is smaller.
Source PSE, KSE Report 2025 (Polish power system), Table 1.1
- RCE price
- loading…
- Life-cycle carbon footprint
- loading…
- Cross-border exchange (scheduled)
- loading…
Source PSE · loading…
processing and carbon intensity: SOURCE
Methodology
- Data source: PSE, report “his-gen-pal-sire” – electricity generation in Poland by fuel, every 15 minutes. PSE usually publishes it 30–45 minutes late, and the site retrieves data every 4 hours.
- Cross-check: at every retrieval, wind and solar from this report must match (within 1 MW) a second PSE report (“his-wlk-cal”). If they don't, the previous data stays, with a badge. Last time: no data.
- Shares: calculated from generation in Poland. We leave out pumped-storage plants – they store energy, they are not a source. Waste is not counted as renewable.
- Life-cycle carbon intensity (g CO₂eq/kWh), SOURCE estimate based on IPCC: generation from each fuel × typical life-cycle emissions of a power plant, in CO₂ equivalent (CO₂eq) – IPCC medians, AR5 report, 2014. For fuels IPCC doesn't cover (lignite, oil, coal-derived gas, waste, “other”, “other renewables”), we made our own assumptions based on factors from KOBiZE (Polish National Centre for Emissions Management). In the quarter-hour we checked (20 Nov 2026, 12:00–12:15), the extreme variants of these assumptions – excluding lignite – changed the result by less than 3%. Electricity bought abroad is not included. Exactly now: no data.
- KOBiZE's 553 kg CO2/MWh (2024) is a different measure: combustion emissions only, averaged over the whole year. We do not compare it directly with our estimate.
- Scheduled cross-border exchange: scheduled exchange according to PSE (sum of two balances: swm_p + swm_np), not measured. “Importing” – power flows into Poland, “exporting” – out of Poland.
Coming soon.